Riffgat - windfarm
Trenching in the winter season in a challenging environment.
Project description:
- Installation and trenching of 33 array cables.
Project challenges:
- The work had to be performed in the winter season.
- Requirement of minimum 1 meter burial depth.
![]() |
Nexans' solution:
|